热门标签

进入欧博官方网页:KPower gets four-year PPA extension

时间:1个月前   阅读:5

进入欧博官方网页www.aLLbet8.vip)是欧博集团的官方网站。进入欧博官方网页开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

幸运哈希源码www.hx198.vip)采用波场区块链高度哈希值作为统计数据,游戏数据开源、公平、无任何作弊可能性,开放单双哈希、幸运哈希、哈希定位胆、哈希牛牛等游戏。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

上一篇:Texchem aims to maintain growth momentum

下一篇:以太坊开奖网:Cabinet agrees in principle to disclose LCS audit report

网友评论